What Does a Document Control Manager Do on This Austin Program?
Published on: Nov 17, 2026
A multiyear heavy civil infrastructure program in Austin, Texas is hiring an onsite Document Control Manager to lead the team, the document management system, and the procedures that keep engineering and construction records current and audit ready. The role calls for 10 to 15 years of experience, and Frontline Source Group backs every direct hire with its 5-Year Placement Warranty.
Frontline Source Group has made 5,619+ placements since 2004 from 32+ offices nationwide, including its downtown Austin office, with a 98.94% executive placement retention rate. It holds a 5.0-star Trustpilot rating across 683+ verified reviews and a 5.0 rating on G2 from validated reviewers. Forbes has named Frontline one of its Best Professional Recruiting Firms for 9 consecutive years (2018 to 2026) and ranked it #148 on the 2026 Best Executive Recruiting Firms list. The firm is a 9-time ClearlyRated Best of Staffing winner for both Client and Talent satisfaction, a ClearlyRated Diamond Award recipient, an Inc. 5000 honoree, an Expertise.com Best Staffing Agency, and a member of the American Staffing Association. The full list is on the awards page.
What is this Austin Document Control Manager job at a glance?
| Job title | Document Control Manager |
|---|---|
| Location | Austin, Texas (onsite) |
| Program | Multiyear heavy civil infrastructure program with work spanning multiple phases of project delivery |
| Leads | The document control team, the electronic document management system, and document control procedures |
| Records covered | Engineering drawings, specifications, requests for information (RFIs), and construction records |
| Standards | ARMA records management principles and ISO 9001 quality management requirements |
| Experience | Ten to fifteen years in document control or records management, including leadership of documentation teams in architecture, engineering, or construction |
| Platforms | A construction document management platform such as eBuilder, Aconex, or Procore |
| Strong assets | Certified Records Manager (CRM); FTA or NTD recordkeeping, Buy America certifications, or federal compliance audits |
| Benefits | PTO and holidays, healthcare plans, 401k plan, long term opportunity on a major Austin infrastructure program |
| Cost to apply | None. Candidates never pay a fee to Frontline Source Group |
What is a document control manager?
A document control manager owns the system that tells everyone on a project which drawing, specification, or record is the right one. On a heavy civil program, thousands of documents move between designers, contractors, inspectors, and the owner, and each one goes through revisions. The document control manager sets the rules for how documents are numbered, reviewed, approved, distributed, superseded, and archived, runs the team that carries out those rules, and administers the software that holds it all. When an auditor, a funding agency, or a claims team asks what was approved and when, the answer comes from document control.
How is a document control manager different from a document controller, a records manager, or a BIM manager?
| Role | Main focus | Typical outputs |
|---|---|---|
| Document controller | Processing documents day to day | Logged incoming documents, transmittals, distribution, and registers |
| Document control manager | Owning the system and the team | Procedures, EDMS workflows and permissions, audits, team leadership, reporting |
| Records manager | Keeping records for their full life | Retention schedules, legal holds, archiving, and disposition |
| BIM manager | Coordinating the 3D model and its data | Model standards, clash detection, model-based deliverables |
This role combines the first three. It leads controllers, applies records management principles, and is accountable for audit readiness on a publicly funded program.
What are the details of this Document Control Manager opening in Austin, TX?
Our client in Austin, Texas is hiring a Document Control Manager for an onsite opportunity.
What is the company profile?
Our client is supporting a multiyear heavy civil infrastructure program with work spanning multiple phases of project delivery.
What is the position overview?
You will lead document control for engineering and construction records. You will oversee the team, the electronic document management system, and the processes that keep project records secure, current, and ready for audit.
What will the Document Control Manager be responsible for?
- Set and enforce procedures for receiving, reviewing, distributing, and retaining engineering drawings, specifications, requests for information (RFIs), and construction records.
- Apply ARMA records management principles and align document control procedures with ISO 9001 quality management requirements.
- Oversee administration and improvement of the electronic document management system, including access permissions and approval workflows.
- Lead document tracking and configuration audits. Verify that teams can identify current versions and trace revisions and field changes.
- Maintain project records in accordance with applicable public funding and retention requirements.
What qualifications does the client want?
- Ten to fifteen years of relevant document control or records management experience, including leadership of documentation teams in architecture, engineering, or construction.
- Experience overseeing a construction document management platform such as eBuilder, Aconex, or Procore.
- Certified Records Manager (CRM) certification is a strong asset.
- Experience with Federal Transit Administration (FTA) or National Transit Database (NTD) recordkeeping, Buy America certifications, or federal compliance audits is highly desirable.
What benefits come with the role?
- PTO and Holidays
- Healthcare Plans
- 401k plan
- Long term opportunity supporting a major Austin infrastructure program
Pay and employment details are discussed directly with a Frontline Source Group recruiter, and candidates never pay a fee to Frontline Source Group.
How does document control work on a construction program?
The posting describes the core cycle: receiving, reviewing, distributing, and retaining engineering drawings, specifications, RFIs, and construction records. In practice, every controlled document moves through the same lifecycle.
What happens to a drawing from receipt to archive?
| Step | What document control does | What can go wrong without it |
|---|---|---|
| 1. Receive and register | Logs the document with its number, title, revision, status, and originator in the EDMS | Documents arrive by email and nobody knows they exist |
| 2. Review and approve | Routes it through the approval workflow to the right reviewers and records each decision | Unreviewed drawings reach the field |
| 3. Distribute | Issues it with a transmittal to the people who need it, with access set by role | Crews build from a copy that was never formally issued |
| 4. Supersede | Marks the prior revision as superseded and withdraws it from use | Two revisions are in use at the same time |
| 5. Capture field changes | Links RFIs, change documents, and field markups to the affected drawing | As-built conditions cannot be traced back to an approval |
| 6. Retain and archive | Keeps the record under the retention schedule and funding requirements, then disposes of it on schedule | Records are missing when an auditor asks |
What is the difference between an RFI, a submittal, and a transmittal?
These three terms come up in every construction document control interview, and they are easy to mix up:
| Document | Who sends it | What it is for |
|---|---|---|
| Request for information (RFI) | Usually the contractor, to the design team or owner | A formal question asking for clarification of the drawings or specifications |
| Submittal | The contractor, for review and approval | Shop drawings, product data, samples, or other information showing how the work will meet the design |
| Transmittal | Anyone sending controlled documents | The cover record showing what was sent, to whom, when, and for what purpose |
How should documents be numbered and revised?
Every program sets its own convention, but most follow the same idea: a unique number built from codes for the project, discipline, document type, and sequence, plus a revision code and a status. An illustrative example is PRJ-CIV-DWG-0142 at revision C, issued for review. Common status codes include issued for review, issued for approval, issued for construction, and as-built. The convention matters less than enforcing it, because a configuration audit depends on every document carrying a number, revision, and status that match the register.
What do ARMA principles and ISO 9001 require of document control?
The posting asks the manager to apply ARMA records management principles and align procedures with ISO 9001.
What are ARMA's Generally Accepted Recordkeeping Principles?
ARMA International's principles set eight standards for any records program:
- Accountability: a senior leader owns the program, and policies and procedures are documented.
- Transparency: processes are documented in a way that staff and auditors can understand.
- Integrity: records are reliable and authentic, with a trustworthy history.
- Protection: records are protected from loss, damage, and unauthorized access.
- Compliance: the program meets laws, regulations, and the organization's own policies.
- Availability: records can be found and retrieved when they are needed.
- Retention: records are kept for the right length of time.
- Disposition: records that have met their retention period are disposed of securely and on schedule.
What does ISO 9001 say about controlling documents?
ISO 9001 calls documents and records documented information and requires an organization to control it so it is available and suitable where and when it is needed and adequately protected. The controls cover distribution, access, retrieval, storage, preservation, control of changes such as version control, and retention and disposition. That maps almost line for line onto the document lifecycle above. ISO 9001:2026, the sixth edition, was scheduled for publication on September 16, 2026, with a three-year transition from ISO 9001:2015, so a document control manager starting now will likely help align procedures with the new edition.
What records rules apply to federally funded transit and infrastructure projects?
The posting asks for records kept in line with public funding and retention requirements, and values FTA, NTD, and Buy America experience. These are the rules behind that request.
How long must federal award records be kept?
Under the federal Uniform Guidance, 2 CFR 200.334, recipients and subrecipients must keep all federal award records for three years from the date they submit their final financial report. Records for property and equipment acquired with federal funds are kept for three years after final disposition, and longer periods can apply, for example while an audit, claim, or litigation is open. On a multiyear program, the retention clock does not start until the end, so the records system has to hold up for the full life of the program and beyond.
What are Buy America certifications?
FTA's Buy America rules in 49 CFR Part 661 say that FTA funds may not be obligated for a project unless the iron, steel, and manufactured products used in it are produced in the United States, unless a waiver applies. The steel and iron requirements cover construction materials made primarily of steel or iron in infrastructure such as rail lines, bridges, and transit facilities. Under 49 CFR 661.6, each bidder or offeror completes and submits the appropriate Buy America certificate. Document control keeps those certificates, along with the supporting material records, so the project can show compliance during a federal review.
What is the National Transit Database?
The National Transit Database (NTD) is FTA's national database of transit system data, covering items such as service, ridership, finances, and assets, reported by transit agencies that receive certain FTA funds. NTD recordkeeping experience shows a candidate understands how program records feed federal reporting.
What does a document control configuration audit check?
The posting asks the manager to lead document tracking and configuration audits and to verify that teams can identify current versions and trace revisions and field changes. A practical audit checklist covers:
- Every document in the field and in the EDMS carries a number, revision, and status that match the master register
- Superseded revisions are withdrawn from use or clearly marked as superseded
- Each revision has an approval record and a transmittal showing who received it
- RFIs, change documents, and field markups link back to the drawings they affect
- Access permissions match each person's role, and approval workflows route to the right reviewers
- Records required by funding and retention rules, such as Buy America certificates, are complete and retrievable
Which document management platforms will you oversee?
- e-Builder: Trimble's construction program management platform, used by many public owners for documents, workflows, and cost control across large capital programs.
- Aconex: Oracle's common data environment for construction and engineering, built for controlled document exchange among many organizations on large projects.
- Procore: a construction management platform widely used by contractors and owners for drawings, RFIs, submittals, and project records.
The posting asks for experience overseeing one of these platforms. Administering permissions and workflows in any of them transfers well to the others.
How much do document control managers earn in 2026?
Federal pay data does not track document control managers as a separate job. The closest benchmarks are administrative services and facilities managers, project management specialists, and construction managers. Pay for this role is discussed with a recruiter.
What does BLS report nationally for related occupations?
| Occupation | Median pay, May 2025 | Jobs in 2025 | Projected change, 2025 to 2035 |
|---|---|---|---|
| Administrative services and facilities managers | 110,500 dollars | 444,800 | 5 percent |
| Administrative services managers (detail) | 114,130 dollars | Not shown | Not shown |
| Project management specialists | 102,320 dollars | Not shown | 7 percent |
| Construction managers | 114,990 dollars | 609,100 | 9 percent |
How does Austin pay compare with the U.S.?
Workers in the Austin-Round Rock-San Marcos metro earned a mean of 35.85 dollars an hour in May 2025, compared with 33.54 dollars nationally, according to the BLS Occupational Employment and Wages release for Austin.
| Occupational group (May 2025) | Austin mean hourly | U.S. mean hourly | Share of jobs, Austin vs U.S. |
|---|---|---|---|
| All occupations | 35.85 dollars | 33.54 dollars | 100 vs 100 percent |
| Management | 71.09 dollars | 69.84 dollars | 10.4 vs 7.2 percent |
| Architecture and engineering | 55.89 dollars | 51.36 dollars | 2.5 vs 1.7 percent |
| Business and financial operations | 44.76 dollars | 45.78 dollars | 8.1 vs 6.8 percent |
Management and engineering work are both more concentrated in Austin than nationally, and both pay above the national mean.
What document control manager interview questions should you prepare for?
Hiring managers on heavy civil programs test the same skills this posting lists. Prepare a real example for each, and review Frontline's interview instructions before your first conversation.
| Interview question | What a strong answer shows |
|---|---|
| A crew built from a superseded drawing. What do you do, and how do you stop it happening again? | You trace how the old revision stayed in use, fix the distribution and withdrawal step, and confirm with a targeted audit. |
| How would you set up document control on a new program phase? | You define numbering, statuses, workflows, permissions, and the register before the first document arrives. |
| Walk me through a configuration audit you led. | You sampled documents, checked revisions against the register, traced field changes, and closed findings. |
| How do you map ARMA principles or ISO 9001 to daily procedures? | You connect principles like integrity, availability, and retention to specific steps in the workflow. |
| Which EDMS have you administered, and how did you manage permissions? | You know eBuilder, Aconex, or Procore in depth and set access by role, not by request. |
| How do you handle records for a federally funded project? | You know grant retention rules, keep Buy America certificates complete, and prepare for federal reviews. |
| How have you led and developed a document control team? | You set standards, trained controllers, balanced workload, and measured quality. |
| What metrics do you report to project leadership? | You track review status against procedure, overdue RFIs and submittals, audit findings, and register accuracy. |
Which certifications help a document control manager stand out?
- Certified Records Manager (CRM): awarded by the Institute of Certified Records Managers and named in the posting as a strong asset.
- Information Governance Professional (IGP): ARMA International's credential for information governance leaders.
- ISO 9001 auditor training: internal or lead auditor training shows you can run audits against the quality standard.
- Project Management Professional (PMP): PMI's project management certification, common among project controls and document control leaders.
Is this document control manager job right for you?
This opening is a strong fit if most of these describe you:
- You have ten to fifteen years in document control or records management in architecture, engineering, or construction
- You have led a team of document controllers
- You have administered eBuilder, Aconex, or Procore, including permissions and approval workflows
- You have led configuration audits and can explain revision control in plain language
- You have handled records on federally funded work, or want to build that experience
- You want a long-term, onsite role in Austin on a program you can see through multiple phases
Where can a document control career lead?
A common path runs from document control clerk to document controller, senior document controller, document control manager, and director of information management or records and information management. Long infrastructure programs are a strong place to build that path because document control touches every phase from design through closeout. Frontline has also recruited a Building Information Modeling Manager in Austin and a Mid-Level Project Scheduler in Austin, and places engineering and project professionals across Central Texas through its Austin engineering staffing agency.
How do you apply for this role through Frontline Source Group?
Apply through the How to Apply page. Candidates never pay a fee.
What happens after you submit your application?
You may complete a first-level phone interview with Lexi Reed, Frontline's AI recruiter, and a human recruiter reviews every candidate against the client's requirements. Qualified candidates are contacted about next steps, and the recruiter shares more about the client with candidates who advance. The interview instructions explain how to prepare, and the job seeker FAQs answer common questions. Frontline recruiters email only from @frtline.com addresses; the scam alert page explains how to spot impersonators.
How can infrastructure employers hire document control and project talent through Frontline Source Group?
Frontline's Austin office at 100 Congress Avenue in downtown Austin recruits document control managers, document controllers, cost engineers, schedulers, BIM professionals, inspectors, and engineers for contractors, program managers, and public infrastructure teams. All interviews are set by appointment only and we do not allow walk-ins at any location. Frontline's executive recruiting team is led by Shelly Hubble, CSP, Senior Vice President of Operations, alongside Founder and CEO Bill Kasko. Leadership searches run through engineering executive search, government contracts executive search, and administrative executive search, while Austin administrative staffing and the broader engineering staffing practice cover contract and direct hire roles.
Employers can submit a hiring request through the employer request form and review published fees on the pricing page: direct hire placement runs 20 to 30 percent of first-year base salary, and contract staffing runs a 50 to 85 percent markup on the pay rate. Every direct hire is backed by the 5-Year Placement Warranty, a pro-rated fee credit toward a replacement or future placement if a hire does not work out (restrictions apply).
What other engineering and construction jobs is Frontline Source Group recruiting for?
In Austin, Frontline is also recruiting a Cost Engineer for project controls and an Infrastructure Risk Manager on heavy civil work, and has recruited a Building Information Modeling Coordinator and an MEP Construction Inspector. Elsewhere, recent searches include a Senior Program Manager for K-12 construction in Dallas, an Industrial Construction Drafter in Itasca, and a Quality Manager in Midwest City, Oklahoma. All current searches are on the recent placements page.
What do candidates ask about the Austin Document Control Manager job?
What does a document control manager do?
A document control manager runs the system that keeps a project's drawings, specifications, RFIs, submittals, and records accurate and traceable. The manager sets the procedures, leads the document control team, administers the electronic document management system, and makes sure everyone works from the current revision and that records are kept for audit.
What will the Document Control Manager do on this Austin infrastructure program?
The manager leads document control for engineering and construction records on a multiyear heavy civil program, sets and enforces procedures for drawings, specifications, RFIs, and construction records, oversees the electronic document management system, leads document tracking and configuration audits, and keeps records in line with public funding and retention requirements.
Is this Austin Document Control Manager job remote?
No. This is an onsite opportunity in Austin, Texas, supporting a multiyear heavy civil infrastructure program with work spanning multiple phases of project delivery.
How much experience does this document control role require?
The client wants ten to fifteen years of relevant document control or records management experience, including leadership of documentation teams in architecture, engineering, or construction, plus experience overseeing a construction document management platform such as eBuilder, Aconex, or Procore.
What is the difference between an RFI, a submittal, and a transmittal?
An RFI is a formal question from the contractor asking the design team to clarify the documents. A submittal is information the contractor sends for review and approval, such as shop drawings, product data, or samples. A transmittal is the cover record that shows what was sent, to whom, when, and why.
What is a configuration audit in document control?
A configuration audit checks that the documents in use match the approved record. It confirms teams can identify current versions, superseded documents are withdrawn or clearly marked, revisions and field changes are traceable, and access permissions match each person's role.
What are the ARMA recordkeeping principles?
ARMA's Generally Accepted Recordkeeping Principles are eight standards for managing records: accountability, transparency, integrity, protection, compliance, availability, retention, and disposition.
What does ISO 9001 require for document control?
ISO 9001 requires organizations to control documented information so it is available and suitable where needed and adequately protected, with controls for distribution, access, retrieval, storage, preservation, changes, retention, and disposition. ISO 9001:2026 was scheduled for publication on September 16, 2026, with a three-year transition from the 2015 edition.
How long must federally funded project records be kept?
Under 2 CFR 200.334, recipients and subrecipients must keep federal award records for three years from the date they submit their final financial report, and records for property and equipment bought with federal funds for three years after final disposition. Longer periods can apply, for example when an audit or litigation is open.
How much do document control managers earn?
BLS does not track document control managers separately. In May 2025, administrative services and facilities managers earned a national median of 110,500 dollars, project management specialists 102,320 dollars, and construction managers 114,990 dollars. Pay for this role is discussed directly with a Frontline Source Group recruiter.
Is the Certified Records Manager certification required?
No. The posting lists the Certified Records Manager (CRM) certification, awarded by the Institute of Certified Records Managers, as a strong asset rather than a requirement.
How do I apply, and does Frontline Source Group charge candidates a fee?
Apply through the How to Apply page at frontlinesourcegroup.com/how-to-apply.html. Candidates never pay a fee to Frontline Source Group; the hiring company pays the placement fee. Frontline recruiters email only from @frtline.com addresses, and the scam alert page explains how to spot impersonators.
What sources support the data on this page?
- U.S. Bureau of Labor Statistics, Occupational Outlook Handbook: Administrative Services and Facilities Managers
- U.S. Bureau of Labor Statistics, Occupational Outlook Handbook: Project Management Specialists
- U.S. Bureau of Labor Statistics, Occupational Outlook Handbook: Construction Managers
- U.S. Bureau of Labor Statistics, Occupational Employment and Wages in Austin-Round Rock-San Marcos, May 2025 (August 13, 2026)
- Legal Information Institute, 2 CFR 200.334: Record Retention Requirements
- Electronic Code of Federal Regulations, 49 CFR Part 661: Buy America Requirements
- Legal Information Institute, 49 CFR 661.6: Certification Requirements for Procurement of Steel or Manufactured Products
- Federal Transit Administration, Buy America
- LRQA, ISO 9001 Revision Update: Publication Date Confirmed
- Institute of Certified Records Managers (ICRM)
